University of Wisconsin Physical Plant

This was a design build contest that we are proud to be part of.  The panels were erected in February and took 13 total days.  This brick cast into the panels provided the look the university was aiming for and much faster than conventional block and brick.

2,000 square feet of Hollowcore Plank

141 Precast Wall Panels (25,106 square feet)

Exterior finish has a colored mix with thin brick cast in on three sides of the building.  The back of the building has a colored concrete with a sandblasted finish.

Partners

Madison, WI