Fran Fruzen Intermediate School
Beloit, WI
This project used precast wall panels and hollowcore to create a gymnasium and floor system for the new Fran Fruzen Intermediate School. An architectural finish of color with a sandblast was used on all panels.
PRECAST ELEMENTS
32,525 square feet of Hollowcore
31 Precast Wall Panels (11,772 square feet)
PARTNERS
GC: JP Cullen
Architect: Bray Architects
EOR: Ambrose Engineering